Maine’s most comprehensive precision manufacturing teaching lab
Harriman assisted the Central Maine Community College with a comprehensive upgrade to its Precision Machine Tool Laboratory. The project entailed the re-configuration of approximately 5,000 sq. ft. of existing laboratories, classrooms and offices and the addition of 3,000 sq. ft. to accommodate state-of-the-art precision manufacturing equipment. Highlights of the renovation include an expanded quality control laboratory, student work area and computer laboratory. The design not only supports the expanding program, but showcases the possible career options and industry technologies.
Building systems were expanded to improve temperature and humidity requirements of the labs as well as comply with current life safety, building and accessibility codes.